On Wednesday there were lots of people present for the work day. A list of names will be at the end of the update. The roof of the existing building is clear (I am purposely skipping lots of details) a TV tower on the back of the building was taken down (to be used later). A lot of stuff was cleaned out of the building, not everything but a lot. The solar panel is at my house to undergo a modification.
Next work day is scheduled for Monday Oct. 9th at 9AM.
We will be switching over to the temporary repeater enclosure.
Removing everything from the old building, in preparation of installing the new building.